TitleProduct

Progressive Stamping Die for Sheet Metal Parts

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Shandong

  • Validity to:

    Long-term effective

  • Last update:

    2017-07-31 21:41

  • Browse the number:

    236

Send an inquiries
+
Qingdao Higrade Moulds & Products Co., Ltd.
Contactaixin:

Mrs. Shirney Chen(Mr.)  

Email:

telephone:

phone:

Arrea:

Shandong

Address:

He Nantou Industrial Park, Ji Hongtan, Chengyang District, Qingdao, Shandong, China 266111

Website:

http://higrademould.aozbao.com/

+





{Steel material}Cr12MOU,SKD11,SKH-9,DC53
{Product material}:SUS304,SPCC and so on
{Scope of application}:Automotive die
{Die types}:Single precss
{Mould Life}:50~100 shots
{Tolerances}:0.02mm
PRODUCTS:

{Processing Date}:35~45 days
{Spare parts}:PUNCH ,MISUMI and so on
{Equipment}:400T Punch
{Produce equipment}:315T Hydraulic machine/press,400T\200T\160T Punch (With the belt feeding machine),110T,80T,40T Punch equipment ,Can meet the need of mass production and testing.
SINGLE STAMPING DIE:

{Service content}:Designing and manufacturing for metal mould and products.
{Main customers}:Haier, Hisense, Midea, Siemens, Sanyo, Electrolux, Toyota, KIA, Foton, SGMW, SKYWORTH etc.
{Main export markets}:Japan, Korea, Thailand, Russia, Germany, Britain, Norway, Italy, Spain, Turkey; America, Brazil, Argentina;South Africa Egypt; Iran, Pakistan, India etc..
{Mold paint}: Painting color depends on customer requirements
(Packaging: wooden case)

PRODUCTION PROCESS:

The first trial success rate is above 95%
{Quotation time}:we will quote in 24 hours after receiving the customer's drawings.
{Data needed to offer}: 2D/ 3D drawing or samples
{Quotation}:Including the accurate price/stage/life and process time.
{The profile}:2D/3D drawing or samples
{Project Manager}:Concentrate on project tracking and after service
{Engineer}:30-50 excellent engineers, have many years experience and English communicate well.
{Warehousing and logistics}:The purchase department use EPR system to make sure buying materials in time.
{Fitter technician}:100-130 experienced workers can meet the customer request of batch production.
{Quality department}:15 members quality control workers, measuring the mould and parts by CMM and projector.
{Domestic delivery}:logistics transportation
{Delivery to overseas}:FOB/CIF/DDU by sea shipping or air shipping