TitleProduct

4 Way Entry Heavy Duty Warehouse Steel Pallet

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Jiangsu

  • Validity to:

    Long-term effective

  • Last update:

    2017-10-01 08:40

  • Browse the number:

    46

Send an inquiries
+
Qingdao Yuanyida Industrial and Trade Co., Ltd.
Contactaixin:

Miss Sophie(Mr.)  

Email:

telephone:

phone:

Arrea:

Jiangsu

Address:

Room 601, Poly Center, No. 8 of Qingda Road, Qingdao, Shandong, China 266000

Website:

http://xzyrack.aozbao.com/

+

Steel Pallet

Used for loading, unloading, moving and storage
Widely Used in pallet rack system, drive in rack system, shuttle rack syetem. 



Feature
Model Steel Pallet
Finish High quality powder coating
Advantages The design is safe, without sharp edges or angles, no danger to hunman body
It can be recycled 100%, suitable for present metal-recycling system
Water/damp/rust-proof, not damged by heat or moisture, meeting the demands of cold storage.
Delivery Time Usually, within 15 days for ordinary order quantity
Big qty will make a special arrangement as your schedule.
Packaging Normal pallet packing with plastic film & steel band



Customized
If you are interested in steel pallet, please inform us the following information:
Length Depth Entry Side Load Capacity
?? ?? 2 or 4?? ??

Noraml Size


Factory
1) Established in 1999, we are a professional designer and manufacturer of storage rack;
2) With ISO9001; CE; TUV certifications;
3) Main Popular Products:
Pallet rack, longspan shelf, light duty shelf, drive in rack, cantilever rack, mezzanine and steel platform, AS/RS system, steel pallet, stack rack, storage cage and other related storage equipment.

Production Process


Certificates


Exhibition


RFQ

 1. Are you a trade company or factory?

 Factory- 42,000m², founded in 1999, more than 200 experienced workers;

2. Location of factory, how to arrive?

In Nanjing City, neighbor of Shanghai, you can fly to Nanjing or Shanghai airport.

 We will arrange a company car to pick you up.

3. Raw Materials:

Steel Q235, from China Famous Steel Company, such as Bao Steel, Wisco...

4. Terms of Payment?

 Regularly, 30%TT in advance, left is against the copy of B/L;

5. Delivery Time?

 Usually: 1*20' GP container, around 15 days; 1*40'GP container, around 20days;

 For some urgent orders, will adjust as your requirement accordingly.

6. Surface Finish?

 Powder Coating/Galvanised, most important is the series of process to deal with the steel in ahead, 

 Such as: acid pickling, phosphorization, drying... to make sure the high color quality, and smooth effect.

Our Service

1. Free Samples(short section around 300mm) within 3days;

2. CAD design as you requirment;

3. Feedback of the status of your order timely in different production process, 

details information with photos;

4. 24 hours service is available;

Any further question, please contact with me freely, thanks!

other products