TitleProduct

Fly Ash AAC Block Production Line Price

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Jiangsu

  • Validity to:

    Long-term effective

  • Last update:

    2017-12-25 04:29

  • Browse the number:

    306

Send an inquiries
+
HANGZHOU WILLING INTERNATIONAL CO., LTD
Contactaixin:

Mr. Eric Zhao(Mr.)  

Email:

telephone:

phone:

Arrea:

Jiangsu

Address:

25th Floor, Taigu Plaza, Jincheng Rd., Xiaoshan, Hangzhou 311202, Hangzhou, Zhejiang, China 311202

Website:

http://tyblockmachine.aozbao.com/

+

 
N0.
Name Unit Type Parameter
4.2 4.8 6.0
1 Capacity m3/year 100000-150000 200000-250000 300000-350000
2 Whole brick size m 4.2×1.2×0.6 4.8×1.2×0.6 6.0×1.2×0.6
3 Cutting precision mm
Length/width/ height
+3,+1,+1 +3,+1,+1 +3,+1,+1
4 Cutting cycle Min/module ≤5 ≤6 ≤6
  1. ,.
    Raw material prepare, mainly deal with blocky lime and sand
  2. .
    Blocky lime broken by the crusher
  3. .
    Ball Crusher mills the small blocky lime into powder.
  4. ,.
    Wet-milling the sand into slurry
  5. .
    Batching the Raw materials
  6. ,.
    After batching pour the raw materials to pour mixer to make slurry
  7. .
    After mixing, pour the slurry uniformly into the mould
  8. ,,.
    After per-curing for a suitable temperature and time, the block will get a suitable hardness, and prepared for cutting
  9. 90.
    Tilting hoister turns over the mould 90°
    10,,.
    Tilting hoister separates the mould and block, and transport the block together with side board to the cutter cart
    11,.
    Longitudinal and horizontal vertical cut the block
    12,,.
    Semi-finished product hoister carries the cut block and side board to the curing cart, marshalling the blocks and waiting for autoclave
    13,.
    Autoclave the block with suitable temperature and pressure
    14,,.
    Stack and pack the finished product
    15,.
    Transportation after packed
    16,.
    Side board return
    17,,.
    Side board combine the mould and oil
    18,,,,.
    Mould transport to the position, wait for next pouring