TitleProduct

Hl Putty for Exterior Wall

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Jiangsu

  • Validity to:

    Long-term effective

  • Last update:

    2017-09-25 09:33

  • Browse the number:

    145

Send an inquiries
+
Nanjing Tianya New Building Materials Co., Ltd.
Contactaixin:

Mr. Peter Yang(Mr.)  

Email:

telephone:

Arrea:

Jiangsu

Address:

8 Floor, Bldg a, No. 68 Shanxi Road, Gulou District, Nanjing, Jiangsu, China 210008

Website:

http://nanjingty.aozbao.com/

+







Main technical performance index

 
Serial number item performance index
1 Container status No agglomeration, smooth
2 Constructability trowelling with no obstacle
3 drying time(Surface drying)(h) ≤5
4 early stage dry cracking resistance(6h)Single track construction thickness≤1.5mm 1mm No crack
5 sanding property Hand grinding
6 Water absorption(g/10min) ≤2.0
7 Alkali resistance(48h) No exception
8 Water resistance(96h) No exception
9 Bond strength /MPa Standard state ≥0.60
Freeze-thaw cycle(5times) ≥0.40
10  flexibility of putty coating Diameter 100mm, no crack
11 Dynamic cracking resistance /mm Wall crack ≥0. 04,≤0.08


Construction method

Water material ratio 1:3-3.5

The substrate must be solid, dry, clean, and free from dust

Small grease dirt use a mild detergent cleaning

Repair of large cracks and depressions on wall surface with cement mortar, repair small holes and cracks with special waterproof wall putty.

After repairing, the wall should be thoroughly dried and polished.

The temperature of the environment and the wall should be between 5 degrees Celsius ~40 degrees Celsius, air relative humidity less than 80%

1mm thickness of the theoretical dosage of 1.5kg/ square meters

Batch scraping construction, can be divided into 2-3 batches scraping finish

Packing and storage:

Packing:25kg/bag
storage: Storage in dry and ventilated place,Not open the original packaging storage period of 6 months