Hl Putty for Exterior Wall
-
Price:
Negotiable
- minimum:
- Total supply:
-
Delivery term:
The date of payment from buyers deliver within days
-
seat:
Jiangsu
-
Validity to:
Long-term effective
-
Last update:
2017-09-25 09:33
-
Browse the number:
145
+
Nanjing Tianya New Building Materials Co., Ltd.
- Contactaixin:
Mr. Peter Yang(Mr.)
- Email: telephone:
-
Arrea:
Jiangsu
Address:8 Floor, Bldg a, No. 68 Shanxi Road, Gulou District, Nanjing, Jiangsu, China 210008
- Website:
+
Main technical performance index
Serial number | item | performance index | ||
1 | Container status | No agglomeration, smooth | ||
2 | Constructability | trowelling with no obstacle | ||
3 | drying time(Surface drying)(h) | ≤5 | ||
4 | early stage dry cracking resistance(6h)Single track construction thickness≤1.5mm | 1mm No crack | ||
5 | sanding property | Hand grinding | ||
6 | Water absorption(g/10min) | ≤2.0 | ||
7 | Alkali resistance(48h) | No exception | ||
8 | Water resistance(96h) | No exception | ||
9 | Bond strength /MPa | Standard state | ≥0.60 | |
Freeze-thaw cycle(5times) | ≥0.40 | |||
10 | flexibility of putty coating | Diameter 100mm, no crack | ||
11 | Dynamic cracking resistance /mm | Wall crack | ≥0. 04,≤0.08 |
Construction method
Water material ratio 1:3-3.5
The substrate must be solid, dry, clean, and free from dust
Small grease dirt use a mild detergent cleaning
Repair of large cracks and depressions on wall surface with cement mortar, repair small holes and cracks with special waterproof wall putty.
After repairing, the wall should be thoroughly dried and polished.
The temperature of the environment and the wall should be between 5 degrees Celsius ~40 degrees Celsius, air relative humidity less than 80%
1mm thickness of the theoretical dosage of 1.5kg/ square meters
Batch scraping construction, can be divided into 2-3 batches scraping finish
Packing and storage:
Packing:25kg/bag
storage: Storage in dry and ventilated place,Not open the original packaging storage period of 6 months