TitleProduct

Plastic PVC Mould Parts of Dripper Irrigation Mold for Audio Cable Flags

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Guangdong

  • Validity to:

    Long-term effective

  • Last update:

    2017-12-13 12:00

  • Browse the number:

    206

Send an inquiries
+
Shenzhen KjnMold Co., Limited
Contactaixin:

Mr. Daniel(Mr.)  

Email:

telephone:

phone:

Arrea:

Guangdong

Address:

Factory: 6# Buliding, Datianyang Industry Park. Guangming New District, Shenzhen, Guangdong, China 518000

Website:

http://kjnmold.aozbao.com/

+

Business Description
We can OEM or ODM for your new project:
Injection Plastic Mold and Mass-production parts
Die casting and Mass-production parts
Stamping mold and parts
Precision machining
Auto mold and parts

Product description:
Plastic injection mould/progressive mould supplier

1.Mould material:45#, 50#, P20, H13, SKD61, etc
2.Base: KM&HASCO DEM standardetc
3.Cavity:Single/multi
4.Runner:Hot/cold
5.Lead time:20-40days
6.Process:CNC, High speed carve, E.D.M, Wire cut, Drill, Injection etc
 
Items Injection Plastic mold
Parts material PC, PP, PBT, ABS, BMC, PMMA, PC+ABS, PP+TD20%, PU, PE, PVC..Etc
Mold base steel NAK80, S136, SKD61,45, S55C, P20, 1730, 2738, 718h, H13, BPMHH, 2343ESR
Core&cavity steel NAK80, S136, SKD61, P20,1730hh, 2738hh, 718h, H13, BPMHH, 2343hh, etc.
Injection system Edge gate, Slid gate,Sub gate,Direct gate, Pin point gate, Valve gate, etc.
Mould standard DME, LKM, HASCO, ETC.
Cavity numbers Single or Multi (Custmozied up to 32Cav.)
Runner Hot or cold
Injection machine 100T-1500T
Cycle time 10-120 seconds
Mold of Steel Suppliers Finkl,Assab,Daidao,LKM,Buderusetc
Hot Runners Suppliers Synventive,Yudo,Incoe,Hasco,DME,Moldmaster,HRS,Delachaux
Mould Life 300,000 - 1,000,000 shots
Tooling lead time 20-40 days
Design software Pro/E, UG, Catia, Solidwork, Moldflow, AutoCad,etc.
Mould Life 300,000 - 1,500,000 shots
Shipping Packing Wooden case or according to customer's requirement
Quality assurance GB/T19001-2008/lean management


Our Advantage:

1.Good Q\ C \ D for customer;
2.Over30 machines with advanced equipment from Taiwan,Japan and Swiss;
3.Strong R&D team
4.Good After-sale service
5.Practices QMS
6.High polish, no sharp, perfect surface finish
7.Low MFQ
8.Practices lean management

Design Definition Requirements

1.Mold basic info,sample;
2.Plastic components function;
3.2D drawing(weight) or 3D drawing;
4.Quantity or technical requirements;
5.Annually forcast or MFQ;
6.Surface treatment requirements, sample is better;
7.Other keypoint.

Company Profile
KjnMold is a Shenzhen-owned enterprise, founded in 1998, located in NanSan District of Shenzhen City.After 15 years of accumulated experience and continuous improvement of quality control.

Company images

Quality control center

Certification



Q / A
Q.When can I get the price of the product?
A.We usually quote within 24 hours after we got your inquiry.If you are very urgent to get the price, please call us or tell us in your email so that we will regard your inquiry priority.

Q.How can I get the accurate price of the product?
A.Usually we will quote to you together with the mold.So plase provide the final drawing.That are:3D drawings in STP,IGS,X-T format are available.

Q.Do you accept the OEM of the product?
A.OEM is welcome.We can make mass-production the parts and assembly components for you.

Q.I have an idea for a new product, but don't know if it can be manufactured.Can you help?
A.Sorry.We cannot provide this service until now.

Q.My components have already been developed on CAD.Can you use the drawings?
A.Yes!DWG, DXF, IGES, Solidworks files can all be used to generate quotes, models and mould.

Q.What type of material is best for my design/component?
A.Materials selection depends on the application of your design and the environment in which it will function.But we can discuss the alternatives and suggest the best material for you.

Q.I've decided to go ahead with my project.How long will it take to get my parts?
A.It can take 3-8 weeks to have the mold tool manufactured depending on the part's complexity and the Cav.Qty (single or multi).We can delivery the parts within 2-3 days.After we had received final approval by your company,

Q.Can you accept the very low MFQ?
A.Yes.We cooperate for two reasons.First is that of friendship.We are very good friends with our customer.We visit them often and they have visit us here and we have had company events to share with them.The second is that we practices lean management.With this management style we are able to make small orders (even under 10 pieces) with hand carving without loosing money.
other products